Power management  14 
Power management 
Connection requirements 
When determining the final location of your power and water connections, consider the distance between 
the facility utilities and the HP POD. 
The facility power connection must be installed in compliance with local electrical codes and regulations. 
HP reference electrical installation design is based on a maximum distance of 15.2 m (50 ft) or line of 
sight between the switchboard and the HP POD. 
HP can provide engineering services to develop the site installation plan and drawings as a supplemental 
service. 
All 3-phase HP POD feeders require that the neutrals and the equipment grounding conductors remain 
isolated. Bonding of the two conductors is allowed at the power source only. 
 
Power requirements 
The HP POD is available in both standard and high density models. 
North America 
• 
The standard density HP POD can be configured for 291 kW redundant power paths for maximum 
reliability or 380 kW power paths for maximum capacity. 
• 
The high density HP POD can be configured for 380 kW redundant power paths for maximum 
reliability or 600 kW power paths for maximum capacity. 
International 
• 
The standard density HP POD can be configured for 291 kW redundant power paths for maximum 
reliability or 450 kW power paths for maximum capacity. 
• 
The high density HP POD can be configured for 436 kW redundant power paths for maximum 
reliability or 600 kW power paths for maximum capacity. 
 
Standard density HP POD 
The standard density HP POD must be supplied with four feeders. 
• 
3-phase 
• 
380 to 415V wye connected 
• 
225A 
• 
50 to 60 Hz 
Each feeder must contain three phase conductors, one neutral conductor, and one equipment ground 
conductor.