Baxi Solarflo In-Roof tile Guida All'Installazione Rapida

Pagina di 24
© Baxi Heating UK Ltd 2011
UK Comp N
o
720291002 (4/11)
All descriptions and illustrations provided in this leaflet have been carefully
prepared but we reserve the right to make changes and improvements in
our products which may affect the accuracy of the information contained in
this leaflet. All goods are sold subject to our standard Conditions of Sale
which are available on request.
MULTIFIT
A Trading Division of Baxi Heating UK Ltd (3879156)
Brooks House, Coventry Road, Warwick. CV34 4LL
Technical Enquiries 0844 871 1568
Website www.bdrthermea.com
e&oe
11.0 Maintenance
It is recommended that the following checks are carried out
on an annual basis:
1) Check the collector installation for any signs of damage or 
any build up of debris.
2) Check for any corrosion to the collector or the mounting 
system and repair if necessary. 
3) Check the tightness of the fasteners. Where fasteners 
cannot be readily accessed, the overall security of the
collector installation may indicate whether problems exist.
4) Check the fittings and pipe work for any signs of fluid 
leakage or damage, including the condition of the pipe 
insulation, and repair if necessary. Check inside the building 
for any evidence of leaks.
5) Examine the roof tiles around the collector installation for 
any damage or deterioration, and repair if necessary.
6) Check for any foliage growth that may cause shading of the
collectors.
7) Where applicable, check the condition of any ballast used 
to secure the system.
8) In areas where there may be a build up of dirt on the 
collector, only non-abrasive cleaning materials and methods
should be used to clean the collectors and mounting 
system components.