Bunn VLPFCanada Manuale Proprietario

Pagina di 28
 
 
 
 
 
 
 
 
Page 27      
SERVICE (cont.)
PN:
 65
8
P1983.40
FIG. 24 TANK HEATER
10179 060100
TANK HEATER
Location:
 
The tank heater is located on the tank lid.
Test Procedure:
1.  Disconnect the brewer from the power source and 
remove both wires from the tank heater.
2.  With  a  voltmeter,  check  the  voltage  across  the 
black  and  white  wires  removed  from  the  tank 
heater when the control thermostat is turned “ON” 
(fully clockwise). Connect the brewer to the power 
source. The indication must be 120 volts ac.
3.  Disconnect the brewer from the power source.
If voltage is present as described, proceed to #4.
If voltage is not present as described, refer to the Wir-
ing Diagram and check the brewer wiring harness.
4.  Check for continuity across the terminals of the 
tank heater.
If continuity is present as described, reconnect the 
wires, the tank heater is operating properly.
If continuity is not present as described, replace the 
tank heater.
NOTE  - If the tank heater remains unable to heat, 
remove  and  inspect  the  heater  for  cracks  in  the 
sheath.
Removal and Replacement:
1.  Remove the white wire from the tank heater ter-
minal and the blue wire from the limit thermostat 
terminals.
2.  Gently pull the liquid level probe and thermostat 
tube with grommet out of the tank lid.
3.  Disconnect the 1/4” flare fitting on the tank lid inlet 
fitting.
4.  Remove the sprayhead and sprayhead nut from 
the panel on the bottom of the hood.
5.  Disconnect the airvent tube from the fitting above 
the sprayhead panel.
6.  Loosen the eight #8-32 nuts on the tank lid and 
remove the tank lid.
7.  Remove  the  two  nuts  from  the  tank  heater  fit-
tings.
8.  Remove the tank heater.
9.  Install the new tank heater with new sealing wash-
ers on the underside of the tank lid.
10. Securely tighten the nuts to be certain of a water-
tight seal.
11.  Reinstall  tank  lid  and  secure  with  eight  #8-32 
nuts.
12. Reinstall the sprayhead tube nut and sprayhead.
13. Reinstall the liquid level probe and thermostat into 
the tank lid.
14. Securely fasten the 1/4” flare fitting to the tank lid 
inlet fitting.
15. Refer to FIG. 25 when reconnecting the wires.
BLK to limit thermostat
WHI to Cordset
FIG. 25 TANK HEATER TERMINALS
P1990.70