Henkel SubFloor Manuale Utente

Pagina di 8
169
168
PREPARING THE SUBFLOOR
The flooring contractor has responsibility for laying the
floorcovering only when he is satisfied that the subfloor
is in a suitable condition to receive the flooring.
Local regulations regarding subfloors and the
installation of floorcoverings must be complied with.
GENERAL INFORMATION 
(NEW SUBFLOORS OR RENOVATION)
The subfloor must be absolutely hard, level, dry, smooth
and structurally sound.
The subfloor must be free of
cracks and other
irregularities and must not be contaminated with paint,
plaster, oil, grease or any other substance which could
affect adhesion.
Cracks must be filled with an appropriate material.
The following information provides you with basic
installation procedures. For technical products or more
detailed instructions please refer to our technical guide.
171 Tiles
172 Sheet
173 Saga
174 Conductive, dissipative
and antistatic
floorcoverings
174 Conductive flooring with
conductive adhesive and
conductive primer
175 Laying procedure for
residential sheet products
Laying procedures
168 to 175
Cold and hot welding
176
Adhesives
177
Maintenance
178 to 181
Technical guide
Technical guide
Te
chnical
guide