GSI Outdoors Commercial Direct Gear Drive Bin Sweep Auger PNEG-1521 Manuale Utente

Pagina di 64
INSTALLATION
15
PNEG-1521     Commercial Direct Gear Drive Bin Sweep Auger
A. Cut an opening in the bin wall for the unloading
tube to pass through. The hole should be
approximately 13 ½” in diameter, 6” below the
level of the floor and inline with the Centerwell
tube.
y
B. From inside the bin, insert the angle ring end of
the Unload Tube Assembly through the hole in the
bin sidewall.
C. On bins > 60’ in diameter, place the angle ring end
of the outer Unload Tube Assembly through the
hole in the bin sidewall, and then place the inner
Unload Tube Assembly into place.
D. Place the 12” Connecting Band onto the end of
the Unload Tube Assembly closest to the
Centerwell.
4. UNLOAD TUBE ASSEMBLY INSTALLATION
Centerwell
Connecting Band
Before installing the Unload
Tube Assembly, remove the
Unload Flight from inside of the
tube. On 36’ and 42’ diameter
bins, the Clutch Control Rod is
shipped inside the Unload Flight.
Unload Tube
FIG. 4-A
FIG. 4-B
13. 500
6. 000