CH Tech EM405D Manuale Utente

Pagina di 48
2.0 INSTALLATION 
 
2.1 UNPACKING AND INSPECTION 
 
Verify  that  there  has  been  no  damage  to  the  shipping  container.    If  damage  exists  then  the 
container  should  be  retained,  as  it  will  provide  evidence  of  carrier  caused  problems.    Such 
problems should be reported to the carrier immediately as well as to C&H.  If there is no damage 
to the shipping container, carefully remove the instrument from its box and inspect for any signs 
of physical damage.  If damage exists, report immediately to C&H. 
 
2.2 HANDLING PRECAUTIONS 
 
The  components  used  in  the  EM405D  are  static  sensitive.    Damage  may  occur  if  proper  static 
precautions are not taken.  Installation of M-modules should only be done at a properly grounded 
static free workstation. 
  
CAUTION:  Read  the  entire  User's  Manual  before  proceeding  with  the 
installation and application of power. 
 
2.3 INSTALLATION OF M-MODULES 
 
To  install  modules,  first  remove  power  from  the  carrier.    Remove  the  front  panel  cover  by 
removing the two screws located at the sides of the panel.  Do not remove the screws located on 
the  bottom  of  the  enclosure.    Slide  the  PCB  out  of  enclosure.    Install  M-modules  by  firmly 
pressing the connector on the M-module together with the connector on the carrier as shown in 
Figure 2.  Secure  the module through the  holes  in the PCB using screws provided with  the M-
module.  
 
WARNING: The EM405D supports M-modules that  use two  or three row 
interface  connectors.    When  using  M-modules  with  only  two 
rows, row C of connector (rear row) is left unconnected. 
 
 
M/MA-Module
 
Carrier
 
A   B   C 
 
Figure 2.  M-module Installation