Ridgid rigid kt-190 Manuale Utente

Pagina di 27
Model KT-190 and KT-200 Pipe Thawing Units
Ridge Tool Company
8
6. If current is below 15 amps on KT-200, switch to B. If
current is still below 15 amps, switch to high position
on center switch and right switch up to C.
7. Continue until 15 amps is reached but not exceeded;
D switch setting is used with long runs.
Multi-Zone System
If you are dealing with multi-zones it will be necessary to
break the electric current flow to specific zones.
1. Make sure unit is unplugged and switch is in the OFF
position and cables are completely uncoiled.
2. Place the pipe clamps several feet apart.
Making pipe connections before plug-
ging in unit prevents arcing between clamp and pipe.
3. Maintain a minimum of 15 feet between clamps when
using the KT-190, 4 feet for KT-200, to prevent ex-
cessive amp draw.
4. Plug unit into a grounded 15 amp outlet making sure
to position the power cord along the clear path se-
lected earlier.
5. Move switch to ON (Up position on KT-190. Center
switch to low and left switch down to A on KT-200.) If
current draw is below 15 amps, select switch B, C, or
D to maximize amp draw and reduce thaw time. (Do
not exceed 15 amps)
NOTE! If the heat is not restored to piping in 10 minutes,
change the location of the clamps to heat a dif-
ferent section of the system. If the above steps
have been tried without success, the entire zone
is frozen and will need to be thawed by following
the Isolating Multi-Zone Steps.
Isolating Multi-Zone Systems
1. Break and cap pipe at point B. This prevents cur-
rent flow through the second zone and allows for
100% of the current to be used in Zone #1. Do not let
pipe ends contact one another.
2. Break the pipe at Point A and place pipe clamps as
shown in Figure 7. This forces the current to flow
through Zone #1. Use a container to collect the water.
3. Once Zone #1 is thawed, turn the unit and circulating
pump OFF. If Zone #2 is frozen, cap the pipe at Point
A Remove the cap from Point B and place a container
at Point B to collect the water.
4. Place the clamps of the opposites sides of the break
at Point B. Once Zone #2 is thawed, turn circulating
pump and thawing unit OFF.
5. Reconnect all pipes and check both Zone #1 and #2
for heat.
Special Applications Procedure
Increasing Thawing Capacity on KT-200
Only
Failure to follow the procedures below for
parallel and series operation of the thawing units can re-
sult in electrical shock or damage to the equipment.
Series Operation
Units arranged in series work best for long pipe lengths.
1. Position units near the frozen section of pipe and next
to one another such that cable lugs are toward pipe.
2. Make sure the units are unplugged and center switch
is in the OFF position.
Figure 7 – Multi Zoned System
Pipe Thawer
Radiator
Radiator
Furnace
Circulating Pump
Water
flow
Radiator
Zone #2
Zone #1
Radiator
B Break
Break
A
WARNING
WARNING