Use the long point of one panel to establish the 
short point of the next adjoining panel.  Add a 
small amount to this measurement to allow for 
the required 1/8” gap as determined by the roof 
pitch factor.  Continue on to the ridge or highest 
point.  After all rake walls are erected, small 
adjustments can be made to make the plane 
of the rake flat: either plane off the high spots 
on the rake panel skins and re-cut the foam, or 
just raise the plate slightly to get a straight line 
along the rake/gable. 
Recesses can be melted out of the foam when 
the foam cutter is placed perpendicular to the 
skin and the depth gauge is set to 1-1/2”.  
Make sure to blow out the loose foam with 
an air nozzle or scrape the recess out before 
installing splines. 
ALL FLOOR, WALL AND ROOF PANELS CAN BE 
FIELD CUT USING THE PRINCIPLES DESCRIBED 
HEREIN.  DIRECT ANY QUESTIONS TO YOUR 
SALES PROFESSIONAL OR THE PREMIER 
LOCATION NEAREST YOU. 
Floors
Before placing panels, pre-assemble the 
dimensional lumber, or I-joists, and install them 
into the edge recesses along the leading edge 
of the panel.  Use 5’ bar clamps (if necessary) 
to help pull twisted lumber flush to the panel 
edges.  Nail both sides of the panel 6” o.c. 
Premier splines can be installed as you set 
each floor panel.  They should be placed on the 
trailing edge of the installed panel.  The Premier 
splines should be placed into the recesses as 
the panels are being installed.  Apply Premier 
Mastic as described in the connection section.