Premier Floors Manuale Utente

Pagina di 56
25
this panel.  Set the next panel into place over 
the bottom plate and tip it into its final position.
 
Measure the total depth of the header required 
and add any sheathing or plating to the top or 
bottom of the header to achieve this dimension. 
Measure the maximum length the header can 
be and cut the header 1/8” short of this, taking 
care to avoid the nails in the Insul-Beam II as 
you cut. 
Apply Premier Mastic to the insides of the 
opening and drop the Insul-Beam II horizontally 
into place.  Do not nail the panel skins to this 
header yet.  Apply Premier Mastic to the top of 
the panel, down the center of the Insul-Beam II 
and inside both ends.