CHIMNEY AND VENTING 
 
Chimney required for the GBU070 is 4” Class “L” (also known as PL vent). A 
starting collar must be used to attach the venting system to the furnace. When 
connecting into a Class “A” or masonry chimney an approved 4” liner MUST be 
used to prevent back drafting of the chimney. 
  
EXISTING CLASS “A” CHIMNEY
Run 4” Class “L” connector from the furnace connection to a positive  
connection with the class “A” chimney. AN APPROVED 4” LINER MUST 
BE USED IN CLASS “A” CHIMNEYS. Make sure each joint is firmly  
locked in place. Make sure the attachment of Class “L” to the Class “A”  
chimney is secure with sheet metal screws. Seal all joints with high  
temperature silicone. Class “L” connector should maintain a pitch on  
rise from the furnace to the chimney of at least ¼” per foot.  
 A): “L” Vent connector 4”          B): “L” Vent elbow 90° adj. 4” 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
EXISTING MASONRY CHIMNEY: Run 4” Class “L” connector from 
the furnace connection to a positive connection with the masonry  
chimney. Make sure each joint is firmly locked in place. Make sure 
the penetration of the Class “L” connector into the masonry chimney  
is sound and secured with high temperature cement. Seal all joints with  
high temperature silicone. Class “L” connector should maintain a pitch  
on rise from the furnace to the chimney of at least ¼” per foot.  
AN APPROVED 4” LINER MUST BE USED IN MASONRY CHIMNEYS
Your new furnace is so efficient; an unlined chimney could remain  
cold and cause a downward pressure creating poor burning, 
incomplete combustion or back draft. 
 A.)“L” Vent connector 4”          B.)“L” Vent elbow 90° adj. 4” 
__________________________________________________________________________
 
NEW VERTICAL INSTALLATIONS: Install 4” Class “L” chimney add 
accessories according to manufacturers instructions and local codes 
(3” clearance to combustibles). Run Class “L” chimney all the way from  
 
the furnace connection to point of termination. Make sure each joint is 
firmly locked in place. Seal all joints with high temperature silicone.  
Class “L” connector should maintain a pitch on rise from the furnace to  
the chimney of at least ¼” per foot. 
A.) Vertical top 4”   
 
D.) Adj. flashing 4” 
B.) “L” Vent pipe 4” 
 
E.) Fire stop spacer 4” 
C.) Storm Collar 4”  
 
F.) “L” Vent 90° adj. 4” clean out tee 
 
 
DIRECT VENT HORIZONTAL TERMINATION IS NOT RECOMMENDED 
 
 
 
 
 
 
 