Kidde Fire Systems Surge Protector P/N 81-CO2MAN-001 Manuale Utente

Pagina di 324
P/N 81-CO2MAN-001
B-3
September 2013
Figure B-2.  3-Well Mercury Check - Installation Detail
B-3.2
Installation
The mercury check is required for applications that use more than five HAD detectors.
The installation procedure for the mercury check is as follows:
1. Remove seal wire.
2. Remove the cover from the enclosure.
3. Route tubing from the pneumatic detectors into the mercury check box. Secure box to the 
installation area using suitable attaching hardware. Ensure that the box is upright and 
level.
4. Secure conduits to the box using conduit nuts.
5. Route the 3/16-inch tubing from the pneumatic control head through a grommet into the 
mercury check box.
6. Fill mercury wells as follows:
7. The proper vent size and well setting is predetermined for each installation and can be 
found on the layout drawing supplied with each system installation.
8. Unscrew two mounting screws and remove the transparent plastic body from the box.
9. Remove plastic caps from vent ports. Insert funnel Part No. 207635 (supplied), and slowly 
fill each well with the full contents of a single vial of mercury. Make certain no mercury 
enters tubing.
1/2 in. EMT
1/8 in. TUBING NUT
(3 SUPPLIED WITH
MERCURY CHECK)
(3) ADJUSTING SCREWS
TRANSPARENT
CHECK BODY
1/2 in. EMT CONNECTOR
COMPRESSION TYPE
RUBBER GROMMET
(SUPPLIED WITH
MECURY CHECK)
3/16 in. COPPER TUBING
FROM PNEUMATIC
CONTROL HEAD(S)
JUNCTION BOX
1/8 in. COPPER TUBING
FROM PNEUMATIC HEAT
DETECTORS