Me Inc NumaLink-3.0 Manuale Utente

Pagina di 33
                                                                NumaLink-3.0™ Users Guide and Service Manual 
 
 
Page 10 of 33 
2.  If one or more input files are found, NumaLink-3.0 schedules a file stability check, sleeps for a file 
stability delay period and proceeds to step 3. 
3.  If the input files are stable, NumaLink-3.0 proceeds to step 4; if not, it schedules a directory check, 
then sleeps and goes to step 1. 
4.  NumaLink-3.0: 
a.  reads the stable files and maps all information in them to an intermediate translation format; 
b.  applies any customization rules as specified by the translation configuration; 
c.  maps the intermediate translation format to the output format and writes the output files, or 
performs a DICOM write to a configured DICOM Application entity; 
d.  executes a post-processing command if specified; 
e.  returns to step 1. 
 
Multiple concurrent translations can be performed, and depending on the configured wait times, they can 
all be in different states at any given point in time.