IBM Marine Radio DS4700 Manuale Utente

Pagina di 270
Attach fiber-optic interface cables to each host adapter. You will connect the other
end of the cables to the controller later in the installation process. For more
information about handling fiber-optic cables, see “Handling fibre-optic cables” on
page 57.
Cabling the ac power supply for ac models
Complete the following steps to connect the ac power supply cable:
1. Using the supplied strap, tie the power supply cord to the rail to provide strain
relief for the power cord.
2. Connect the power cable to the power supply.
3. Plug the supplied power cable into a properly grounded electrical outlet. For
maximum protection against power loss, connect each of the two power
supplies to a different power source.
startup of the storage subsystem.
Cabling the dc power supply for dc models
Statement 29:
CAUTION:
This equipment is designed to permit the connection of the earthed conductor
of the dc supply circuit to the earthing conductor at the equipment.
This equipment is designed to permit the connection of the earthed conductor
of the dc supply circuit to the earthing conductor at the equipment. If this
connection is made, all of the following conditions must be met:
v
This equipment shall be connected directly to the dc supply system
earthing electrode conductor or to a bonding jumper from an earthing
terminal bar or bus to which the dc supply system earthing electrode
conductor is connected.
v
This equipment shall be located in the same immediate area (such as,
adjacent cabinets) as any other equipment that has a connection between
the earthed conductor of the same dc supply circuit and the earthing
conductor, and also the point of earthing of the dc system. The dc system
shall not be earthed elsewhere.
v
The dc supply source shall be located within the same premises as this
equipment.
v
Switching or disconnecting devices shall not be in the earthed circuit
conductor between the dc source and the point of connection of the
earthing electrode conductor.
Statement 30:
Chapter 3. Cabling the storage subsystem
111