Hood J3250M Manuale Utente

Pagina di 104
Before Installing HP Hub & Switch Management for OV-UX 
Required Network Configuration 
* The more OpenView Windows (ovw) sessions you run, the more OS configured swap 
space will be necessary. A good guideline is to configure 25 megabytes of swap space for 
each additional ovw session that you expect to run. 
Required Network Configuration 
The installation starts the automatic discovery and layout of the network 
map, based on your internetwork’s IP addressing scheme. This depends on 
the following: 
Correct IP addressing. The IP addresses and subnet masks must be 
correctly configured on the manager station, and on all routers and 
gateway hosts that support SNMP. Otherwise, the automatically generated 
map could contain incorrect networks with nodes from outside the admin­
istrative domain. 
Network design that aids isolation of network faults and traffic, by doing 
the following: 
Logically subdividing an internetwork into manageable-sized 
networks and subnetworks, using routers, gateway hosts and IP 
subnet addressing. 
Physically subdividing networks and subnetworks into manageable-
sized segments using hubs, bridges, and gateway hosts. HP recom­
mends that the segments have no more than 200 nodes each. 
SNMP-based, MIB-I (RFC 1156) or MIB-II (RFC 1213) compliant agents 
running on management stations, routers, and gateway hosts at a 
minimum, and running on bridges and hubs for manageable segments. 
This ensures speed and accuracy of map generation. 
All HP 9000 Systems (manager stations or hosts) that are running HP-UX 
version 10.20 or HP-UX version 11.00 should also be running the HP 
OpenView SNMP Agent software as part of their networking software. 
All managed HP devices should contain a supported version of agent 
firmware. 
S
w
itch 
Ma
nag
emen
t f
o
r OV
-
B
e
fo
re
 In
st
all
ing
 HP 
H
u
b & 
2-3