GSI Outdoors PNEG-951 Manuale Utente

Pagina di 102
39
PNEG-951
1. Press the
button. Press
(enter twice) to bypass the other screens.
2. Press the
button.
3. Press the
button to adjust the settings.
      4. Press the
button to accept the changes.
Unload Delay
The unload delay is used to control the amount of time the unload auger runs after the metering rolls stop to
allow the unload auger to clean itself out.
To change the setting of this delay follow these instructions:
1.
Press  the
button.  Press
(enter three times) to bypass
the other screens.
2.
Press  the
button.
3.
Press the
button to adjust the settings.
      4.   Press the
button to accept the changes.