Furuno SC-120 Manuale Utente

Pagina di 96
2. INSTALLATION 
 
 
 
2-4 
2.2 
Installing the Antenna Units 
2.2.1 
SC-series antenna unit 
1.  Prepare an installation post for the antenna in accordance with the illustration 
shown below. 
BOW
Bow direction is
between antennas
#1 and #2.
Gasket
(supplied in installation materials)
f
60.5 mm
f
15
Recommended Flange
Post should be constructed from 
stainless steel and measure 
4mm or larger in thickness.
3 mm or less
(Option)
Name: Flange
Type: OP20-31
Code No.: 004-378-230
The width of welding should be 
within 3 mm from the mast so
that the welding does not touch
the spring washer.
Weld all the way around.
 
Installation post