Cooper Lighting 84700 Manuale Utente

Pagina di 41
9131 
Rev. M 
 
SECTION 3 
 
INSTALLATION AND OPERATION 
 
 
WARNING 
 
INSTALLATION, SERVICE, MAINTENANCE OR OPERATION SHOULD 
BE PERFORMED BY QUALIFIED PERSONNEL ONLY.
 
 
 
3.1 
INSTALLATION 
 
All CSC units are supplied ready for operation with all ordered options installed.  
When properly connected, no electrical adjustments should be necessary prior to use. 
 
3.1.1 
Location 
 
The CSC may be installed in all locations meeting the environmental requirements as 
specified in paragraph 1.2.4.3 except where explosive or highly corrosive 
atmospheres may be present.  The equipment should be accessible to qualified 
personnel only.  In addition, adequate drainage should be provided to preclude the 
possibility of standing water hindering maintenance or normal operations. 
 
3.1.2 
Power Requirements 
 
Standard model CSC units require a source of 120 VAC at 50/60Hz.  If the particular 
unit to be installed is equipped with option  -2, a source of 220 to 240 VAC at 
50/60Hz is required.  Refer to Table 1-1. 
 
3.1.3 
Detail Installation Checklist 
 
NOTICE:   
(1)   
Read and become familiar with this procedure  before 
attempting installation of this equipment.  Improper 
installation procedures can damage this equipment and may 
void the warranty! 
 
(2) 
Further, the instructions for each equipment option included 
should similarly be understood before proceeding with 
installation. 
 
(3) 
Installer should initial in space provided (  ) after completing 
each step. 
 
3.1.3.1 
Mechanical Installation 
 
(  )  
1. 
Unpack the CSC, open the enclosure and check for any 
shipping damage. 
 
(  ) 
2. 
Remove the dead front cover from the high voltage section.