AT&T DEFINITY Generic 3 Manuale Utente

Pagina di 458
Unexpected Command Operations
Issue  4 September 1995
D-3
Unexpected Command Operations
The following table indicates and explains the unexpected operations the 
customer may encounter in using the Call Vectoring commands.
Table D-2.
Unexpected Command Operations
Command Step
Customer Observation(s)
Cause(s)
adjunct routing
Step skipped (that is, default 
treatment).
Invalid link extension.
No trunks available.
COR/FRL restricted.
Timeout.  (Ap plication did not 
respond within the time specified 
in the 
wait-time
 command 
and/or within the time length of 
the recorded announcement.)
Digit string inconsistent with 
networking translation.
ASAI link down.
Invalid route destination returned 
from adjunct.
Busy tone.
Busy local destination has no 
available coverage points.
Network reorder or intercept.
Digit string supplied by adjunct 
inconsistent with public network 
translation.
Digit string inconsistent with 
networking translation.
Intercept or reorder tone 
heard.
Vector processing succeeded 
routing off switch, but a problem 
has occurred before routing to its 
final destination.
All trunks busy on a quiet 
system.
Two switches treating each other 
as backup switch.
Step skipped.
Port Network (PN) link down.