Delta Tau GEO BRICK DRIVE Manuale Utente

Pagina di 294
 Geo Brick Drive User Manual 
Pinouts and Software Setup 
 31 
Transformers 
Y-Y or Y-
 transformers should be used. 
-
  Transformers  are  NOT  advised.  They  try  to  balance  phases  dynamically,  creating  instances  of 
instability in the Geo Brick Drive’s rectifying circuitry. 
 
 
Note 
A line reactor should be installed if a transformer or reliable source of 
power  is  not  available.  Line  reactors  suppress  harmonics  bi-
directionally, eliminating low frequency spikes. 
 
Fuses 
High peak currents and high inrush currents demand the use of slow blow time delayed type fuses. 
RK1  or  RK5  (i.e.  current  limiting)  classes  are  recommended. 
  and 
  from 
 or similar fuses can be used.  
 
The following table summarizes fuse gauges for three-phase bus input (240VAC) at full load: 
 
Model 
Fuse (amps) 
 
Model 
Fuse (amps) 
GBL4-xx-5xx 
15 
 
GBL8-xx-552 
30 
GBL4-xx-8xx 
25 
 
GBL8-xx-882 
45 
GBL6-xx-5xx 
35 
 
GBL8-xx-582 
35 
GBL6-xx-8xx 
45 
 
GBL8-xx-852 
35 
 
Specific applications fuse sizing can be done using the following equations.  
Take, as an example, a 4-axis Geo Brick (5/10A) on 240VAC bus, and driving 4 motors (5A continuous 
current rating):  
  
DC Bus Voltage: 
 
     
  √     
     
                      
[VDC] 
Motor Phase voltage: 
 
          
  
 
     
√ 
  
   
    
        
[VDC] 
Power per axis: 
 
    
       
          
   
           
                            [Watts] 
Total power: 
 
     
   ∑  
    
                           
[Watts] 
Dissipated power: 
 
   
           
     
                            
[Watts] 
Current draw per phase 
(for 3
 bus input) 
 
      
  
 
     
    
   
 
√     
     
  
          
           
            
[Amps] 
Current draw per phase 
(for 1
 bus input) 
 
      
  
 
     
    
   
 
√     
     
  
          
           
            
[Amps] 
 
Thus, 15 and 25 –amp fuses are chosen for three and single phase bus power input lines respectively.