BOTTOM CLOSURE PANEL
These furnaces are shipped with bottom enclosure panel installed
in bottom return-air opening. This panel MUST be in place when
side return air is used.
To remove bottom closure panel, perform following:
1. Tilt or raise furnace and remove 2 screws holding front
filler panel. (See Fig. 25.)
2. Rotate front filler panel downward to release holding tabs.
3. Remove bottom closure panel.
4. Reinstall front filler panel and screws.
VII.
GAS PIPING
Gas piping must be installed in accordance with national and local
codes. Refer to current edition of NFGC in the United States.
Canadian installations must be made in accordance with NSCNG-
PIC and all authorities having jurisdiction. Gas supply line should
be a separate line running directly from meter to furnace, if
possible. Refer to Table 3 for recommended gas pipe sizing. Risers
must be used to connect to furnace and to meter. Support all gas
piping with appropriate straps, hangers, etc. Use a minimum of 1
hanger every 6 ft. Joint compound (pipe dope) should be applied
sparingly and only to male threads of joints. Pipe dope must be
resistant to propane gas.
CAUTION:
Connect gas pipe to furnace using a backup
wrench to avoid damaging gas controls. Failure to follow
this caution will result in intermittent unit operation or
performance satisfaction.
WARNING:
Gas valve shutoff switch MUST be facing
forward or tilted upward. Failure to follow this warning
could result in property damage or death.
WARNING:
Never purge a gas line into a combustion
chamber. Never test for gas leaks with an open flame. Use
a commercially available soap solution made specifically
for the detection of leaks to check all connections. A
failure to follow this warning could result in fire, explo-
sion, personal injury, or death.
WARNING:
Use proper length of pipe to avoid stress on
gas control manifold. Failure to follow this warning could
result in a gas leak resulting in fire, explosion, personal
injury, or death.
Install a sediment trap in riser leading to furnace. Trap can be
installed by connecting a tee to riser leading to furnace so
straight-through section of tee is vertical. Then connect a capped
nipple into lower end of tee. Capped nipple should extend below
level of gas controls. Place a ground joint union between gas
control manifold and manual gas shutoff valve. (See Fig. 26.)
Fig. 24—Bottom Filter Arrangement
A00290
WASHABLE
FILTER
FILTER
SUPPORT
FILTER
RETAINER
17
1
2
-IN. WIDE
CASINGS ONLY:
INSTALL FIELD-SUPPLIED
FILTER FILLER STRIP
UNDER FILTER.
1
24 
1
/
2
3
21-IN. WIDE
CASINGS ONLY:
SUPPORT RODS (3)
EXTEND 1/4" ON EACH
SIDE OF FILTER AND
REST ON CASING FLANGE
Fig. 25—Removing Bottom Closure Panel
A93047
BOTTOM
CLOSURE
PANEL
FRONT FILLER
PANEL
TABLE 3—MAXIMUM CAPACITY OF PIPE*
NOMINAL
IRON
PIPE
SIZE
(IN.)
INTERNAL
DIAMETER
(IN.)
LENGTH OF PIPE (FT)
10
20
30
40
50
1/2
0.622
175
120
97
82
73
3/4
0.824
360
250
200
170
151
1
1.049
680
465
375
320
285
1-1/4
1.380
1400
950
770
660
580
1-1/2
1.610
2100
1460
1180
990
900
* Cubic ft of gas per hr for gas pressures of 0.5 psig (14-in. wc) or less, and
a pressure drop of 0.5-in. wc (based on a 0.60 specific gravity gas). Ref:
Table 12.2 NFPA 54-2002.