Philips HEARTSTART XLT M3500B Manuale Utente

Pagina di 180
Operational Checks
11-4
Maintaining the HeartStart XLT
Shift/System Check
To perform the Shift/System Check:
1. Turn the HeartStart XLT off. 
2. Connect a 50 ohm test load to the pads patient cable (instead of pads).
3. If a Data Card is routinely used, insert a Data Card into the HeartStart 
XLT.
4. If a power module is used, unplug the power module.
5. Insert a charged battery.
6. While pressing 
, press On to start the test.
7. Follow the prompts on the display to proceed with the test. If the message 
6HUYLFH8QLW appears, check the information in Table 12-2 and Table 12-3 . 
If the message continues to appear, do not use the device, and call for
service.
The test takes less than a minute to complete. When it is done, a report is 
printed, as shown in Figure 11-1. Test results are listed as Pass or Fail, with 
the exception of the Data Card Test. For the Data Card Test, the results indi-
cate either the amount of storage time remaining on the data card or that no 
data card is present.
Figure 11-1  Shift/System Check Report
Print
Strip
Shift/System Check                  8 Jan 1999 13:52:17             SN:US00000001
Current Tests:
General System Test
Pass
ECG Test
Pass
Backup Power Test
Pass
SpO2 Test:
Pass
Data Card Test
2:00
Defib Test
Pass
Pacer Test
Pass
Qty/Check List:
___ Defibrillator Inspection
___ Cables/Connectors
___ Defibrillation Pads
___ Monitoring Electrodes
___ Charged Batteries
___ AC/DC Power Module
___ Printer Paper
___ Data Card
___ Ancillary Supplies
___ SpO2 Sensor