Fujitronic Programmable Operation Display UG520H-x Manuale Utente

Pagina di 275
2 - 24
8 MITSUBISHI PLC 
 2
PLC
D-sub  25pin(Male:    )
D-sub  25pin(Male:    )
FG
SG
1
7
12
13
14
17
2
7
15
SG
16
4
17
5
18
20
21
3
18
19
24
25
POD  (CN1)
+SD
-SD
+RTS
-RTS
-CTS
+CTS
+RD
-RD
+RxD
+TxD
+DSR
+DTR
-RxD
-TxD
-DSR
-DTR
*
Use twist shielded cables.
Wiring
The following is a diagram to show the wiring of the cable which connects POD to PLC.
(connection of the UG200C-M)
RS-422
Wiring Diagram 1
According to our noise tests, the attachment of a ferrite core improves
noise voltage by 650~900V and aids in preventing communication errors.
Note
In case of direct connection with the CPU port of A/QnA series, be sure to attach the
ferrite core to the cable between POD and the CPU port of A/QnA series for noise.
A Ferrite core is sold as an optional accessory.
A noise filter(ferrite core) is sold as an optional accessory.  When you buy it, specify
“ZCAT032-0930” as the model name.
In consideration of such noise problems, it is recommended that the standard type link
unit be used in such a case when the cable length of more than 15m is required.
POD
A/QnA Series
CPU
Ferrite core