Cisco DPC3825 Manuale Utente

Pagina di 104
96 
 
4021196 Rev B 
 
Front Panel LED Status Indicator Functions 
 
Front Panel LED Status Indicator Functions 
Initial Power Up, Calibration, and Registration (AC Power applied) 
The following chart illustrates the sequence of steps and the corresponding 
appearance of the residential gateway front panel LED status indicators during 
power up, calibration, and registration on the network when AC power is applied to 
the residential gateway. Use this chart to troubleshoot the power up, calibration, and 
registration process of your residential gateway. 
Note: After the residential gateway completes Step 6 (Request High-Speed Data 
Provisioning File), the modem proceeds immediately to Normal Operations. See 
Normal Operations (AC Power applied) (on page 98). 
 
Front Panel LED Status Indicators During Initial Power Up, Calibration, and Registration 
 
High Speed Data Registration 
Step:  
Front Panel Indicator
 
Self 
Test
 
Downstream 
Scan
 
Downstream 
Signal Lock
 
Ranging
 
Requesting IP 
Address
 
Request High 
Speed Data 
Provisioning File 
POWER 
On  
On 
On 
On 
On 
On 
DS 
On 
Blinking 
On 
On 
On 
On 
US 
On 
Off 
Off 
Blinking 
On 
On 
ONLINE 
On 
Off 
Off 
Off  
Off 
Blinking 
ETHERNET1-4 
On 
On or 
Blinking 
On or 
Blinking 
On or 
Blinking 
On or Blinking 
On or Blinking 
USB 
On 
On or 
Blinking 
On or 
Blinking 
On or 
Blinking 
On or Blinking 
On or Blinking 
WIRELESS 
LINK 
Off 
On or 
Blinking 
On or 
Blinking 
On or 
Blinking 
On or Blinking 
On or Blinking 
WIRELESS 
SETUP 
Off 
On or 
Blinking 
On or 
Blinking 
On or 
Blinking 
On or Blinking 
On or Blinking