Marvel MPRO24DZBGXR Istruzione Sull'Installazione

Pagina di 56
21
1
1
8
(28.4mm)
Typical
1
4
" (6.4mm) thick battens-
1
4
" (6.4mm) Plywood / Panel
3
16
" (4.8mm) 
thick back up-
1
8
" (4.8mm) 
thick back up-
1
4
" (6.4mm) Plywood / Panel
3
16
" (4.8mm) thick battens-
24
5
16
"
(61.8cm)
-
1
16
" (1.6mm) rout
2
3
16
(55.6mm)
1
2
" (12.7mm) Plywood / panel
5
16
(7.9mm)
Metal side panel
24" 
(61cm)
typical installation 
opening
Holes in
roller base-
#8 screws-
Cap-
Figure 26
Figure 27
Instructions for Fastening Side Panels to 
Wine cellar
1.  Side panels should be 24" (61cm) deep (or 24 
5
16
(61.8cm) deep when tucked into the front trim).
2.  Panel height to match installation height.
3.  Install the side panels per drawings on the right.
To avoid damage to panels or flooring, raise panels slightly, 
to clear floor when installing.
Drill three (3) holes equal distance apart in vertical section 
of aluminum frame and install pan head screws as shown.
Anchor side panel with screw as shown. Be sure screw 
used goes no more than 
1
2
" (12.7mm) deep into product. 
Do NOT overtighten.
NOTE
Kick Plate Installation
Use two (2) #8 sheet metal screws (supplied) to facilitate 
holding your kick plate in place. Mount screws in holes in 
roller base. Cover screw heads with caps supplied. (See 
Figure 27).
INSTALLING SIDE PANELS AND KICK PLATE