Planning the Installation
Junction
Box
Trim frame
(accessory)
3/4" (19mm)
Min. to any
material*
10" (254mm) Min. to combustibles
2" (51mm) Min. to non-combustible
1/4"
(6mm)
23" (584mm)
24" (610mm)
Rotisserie mounting
bracket (factory installed)
Junction
Box
Trim frame
(accessory)
3/4" (19mm)
min. to any
material*
1/4"
(6mm)
10" (254mm) Min. to combustibles
1 1/4" (32mm) Min. to non-combustible
28 1/2" (724mm)
To finished
countertop
23 3/4" (603mm)
24" (610mm)
oBSB162 cutout dimensions -
side View
oB36, oBs36, oB52 and oBs52 
cutout dimensions - Side View
Location Planning - Enclosed 
Cabinets
Maintain all minimum clearances specified on pages 7 
and 8.
For proper outdoor grill operation, provide a flat, level 
mounting surface with minimum 3/4” thickness.
All models are designed to allow installation in 
combustible or non-combustible base material 
structures.
On installations without a LP cylinder tank located 
below the unit, plan the installation so that the gas 
shut-off valve and pressure regulator are accessible 
after the appliance is installed so that gas and power 
can be turned off if service is required. Also, make sure 
the electric plug can be disconnected easily during 
service.
Optional Finish Trim Kits
The optional finish trim can be installed on the countertop 
to finish the sides and back of the countertop opening. The 
stainless steel finish trim can be caulked to the countertop 
and should be secured to the base enclosure with flat head 
screws. Center the trim within the cutout dimensions noted 
in this manual, then utilizing the deck screws along with 
the holes located along the vertical sides of the finish trim, 
install them securely to the base enclosure countertop sub-
straight. Install the trim before installing the grill.
Enclosed Cabinet Installations with a LP 
Cylinder
When using a LP-gas cylinder, it must be completely 
enclosed, It must also be ventilated by openings on the 
sides, back and floor of the enclosure. Each opening 
must have a total area of no less than 10 square 
inches (254 square mm).
Plan to install the grill in a base structure that has one 
of the following structural details:
The LP cylinder valve shall be readily accessible 
for hand operation. A door on the enclosure to 
gain access to the cylinder valves is acceptable, 
provided it is non-locking and can be opened 
without the use of tools.
The enclosure for the LP-gas cylinder shall isolate 
the cylinder from the burner compartment to 
provide shielding from radiation, a flame barrier 
and protection from foreign materials such as hot 
drippings.
There shall be a minimum clearance of 2 inches 
(51mm) between the floor of the LP-gas cylinder 
enclosure and the ground.
The design of the outdoor cooking enclosure 
must allow the LP-gas cylinder to be connected, 
disconnected and the connections inspected and tested 
outside the cylinder enclosure.
Connections which may be disturbed when installing 
the cylinder in the enclosure can be leak tested inside 
the enclosure.
Internal mounting means shall be provided on the 
outdoor gas grill for mounting the LP-gas supply 
cylinder. If the outdoor grill is not in use, the gas must 
be turned off at the supply cylinder.
See page 8 for overall cabinet dimensions
See page 8 for overall cabinet dimensions