Acronis Backup & Recovery 10 Advanced Workstation TIDLBPDES5 Manuale Utente
Codici prodotto
TIDLBPDES5
•
Edit the backup policy on the management server in case
a centralized plan has failed
2
Warning
Last result is
"Succeeded with
warning"
"Succeeded with
warning"
View the log to read the warnings -> [optionally] Perform
actions to prevent the future warnings or failure.
actions to prevent the future warnings or failure.
3
OK
Last result is
"Succeeded", "-", or
"Stopped"
"Succeeded", "-", or
"Stopped"
No action is required.
The "-" state means that the task has never been started or
has been started, but has not finished yet and so its result is
not available.
has been started, but has not finished yet and so its result is
not available.
6.1.2.2.
Working with backup plans and tasks
Actions on backup plans and tasks
The following is a guideline for you to perform operations with backup plans and tasks.
To
Do
View details of a plan/task
Backup plan
Click
View details.
In the Plan Details (p. 189) window, review the plan details.
Task
Click
View details.
In the Task Details (p. 187) window, review the task details.
View plan's/task's log
Backup plan
Click
View log.
You will be taken to the Log (p. 190) view containing the list of the plan-related
log entries.
log entries.
Task
Click
View log.
You will be taken to the Log (p. 190) view containing the list of the task-related
log entries.
log entries.
Copyright © Acronis, Inc., 2000-2009
183