Samsung NE595R0ABSR Istruzione Sull'Installazione

Pagina di 12
02 
CONNECTING THE POWER
Connecting the power _
9
sTEP 4.  INsTAllING ThE CoNDuIT
Remove the conduit connection plate from the rear of the drawer body and rotate it as shown below.
The conduit hole (1
1
/
8
”) must be used.
1
1
/
8
1
3
/
8
1
1
/
8
1
3
/
8
1.  Prepare the conduit cord shown in Figure 1.
2.  Install the conduit cord as shown in Figure 2.
Conduit connection plate
Strain relief
Ring
Body
Figure 2
1”
3
1
/
2
3
/
8
1”
3
1
/
2
3 wire
4 wire
Knockout surface
Figure 1
3
/
8
For conduit installations, insert the strain relief (not included) into the conduit hole (1
1
/
8
”). Then thread 
the conduit cord through the body of the strain relief and fasten the ring. Reinstall the bracket.
Installing a 3-wire conduit
•  Aluminum building wire may be used but it must be rated for the correct amperage and voltage to 
make the connection. Connect wires according to Step 4 depending on the number of wires.
•  Wire used, location and enclosure of splices, etc., must conform to good wiring practices and local 
codes.
1.  Loosen the 3 lower terminal screws from the terminal 
block.
2.  Insert the center bare wire (white/neutral) tip through 
the bottom center terminal block opening. On certain 
models, the wire will need to be inserted through the 
ground strap opening and then into the bottom center 
block opening.
3.  Insert the two side bare wire tips into the lower left 
and the lower right terminal block openings.
4.  Tighten the screws until the wire is fi rmly secured (35 
to 50 inch-lbs.). Do not over-tighten the screws since 
it could damage the wires.
5.  Go to step 5 on page 10 and proceed with the 
installation.
White
Black
Red
Ground 
strap
Neutral 
terminal
Wire tips
Red
White
Black
Installation-USA DG68-00108G-01_EN.indd   9
2012-02-16   �� 11:14:27