Desa S36RH Manuale Utente

Pagina di 20
www.desatech.com
111026-01C
11
OptiOnal gaS line 
inStallatiOn
Gas line hook up should be done by your supplier 
or a qualified service person.
Note
: Before you proceed, make sure your gas 
supply is turned off.
Use only a 1/2" black iron pipe and appropriate 
fittings. 
1.  Remove knockout indentation on refractory or 
firebrick wall located above the refractory hearth 
floor. The knockout indentation must be firmly 
tapped with any solid object such as a 1/2" dowel 
until it is released. Remove fragmented portions 
of refractory (see Figure 19).
2.  Remove gas line cover plate located on either 
side of fireplace and pull out insulation from 
gas line conduit sleeve. Save insulation for 
reuse. Replace screws.
3.  Run a 1/2" black iron gas line into the fireplace 
through the rear at gas line conduit sleeve (if 
using a raised platform, add height). Provide 
sufficient gas line into fireplace chamber for 
fitting connection (see Figure 20, page 12). 
Note
:  Secure  incoming  gas  line  to  wood 
framing to provide rigidity for threaded end.
Figure 19 - Gas Line Knockout
Side 
Firebrick 
Finished 
Side
Refractory 
Knockout 
Plug
Outside of 
Fireplace
Gas Line 
Conduit
Insulation
Gas 
Conduit 
Cover
1/2" Dowel
4.  Repack insulation around gas line and into 
sleeve opening. Seal any gaps between gas line 
and refractory knockout hole with refractory ce-
ment or commercial furnace cement, Install the 
gas appliance or cap-off gas line if desired.
Venting inStallatiOn
Continued
EFFECTIVE HEIGHT OF
TERMINATION CAP
30E-8DM
EFFECTIVE HEIGHT OF
TERMINATION CAP
EFFECTIVE HEIGHT OF
TERMINATION CAP
MINIMUM
HEIGHT
14.5 FT.
MINIMUM
UP TO 6FT.
HEIGHT
MAXIMUM
14.5 FT.
(WITH TWO ELBOW SETS)
MINIMUM HEIGHT OF 22 FT.
EFFECTIVE HEIGHT OF
MAXIMUM HEIGHT OF 50 FT.
MAXIMUM
UP TO 6 FT.
(ANY SYSTEM)
50 FT.
  HEIGHT
MAXIMUM
30E-8DM
TERMINATION CAP
Figure 18 - Typical Residential Installations