Beckett SLD5125 Manuale Utente

Pagina di 32
 
28 
Installation and Service Check List 
 
       Boiler Model: _______________________                  Serial No.: ____________________ 
       Installation Date: ______________________ 
       Installer Name: ________________________ 
       Phone No.: ____________________ 
 
       Boiler Installation 
□ 
Boiler and burner wired per wiring diagram and National Electric Code?  120VAC wiring 
Type_____ Size _____ AWG 
 
Boiler level and in solid contact with floor? 
 
 
Burner sealed to boiler?  Mounting nuts tight? 
 
Space is large enough to provide required clearances? 
 
NFPA 31 Installation of Oil Burning Equipment followed? 
□ 
Local, state and national codes, laws, regulations and ordinances followed?
  
 
       Vent System 
 
New vent pipe installed and properly sealed? 
 
Existing chimney and vent system inspected to NFPA 211 and in good condition? 
□ 
Vent size checked against furnace manual and codes? 
 
       B
r Operation 
urne
 
Burner Model: __________________  Nozzle: _______GPH _______Deg. ____Type_______ 
 
Burner Pump Pressure: ______________ 
 
Fuel filter and fuel lines installed and inspected as per burner manual? 
 
Air bled from oil piping? Piping checked for leaks? 
□ 
Burner started, adjusted and tested per burner manual? 
 
       Boiler Operation 
 
Limit control tested for proper operation? 
 
Thermostat heat anticipator set per burner manual instructions? 
□ 
Boiler observed going through several operational cycles for proper operation? 
 
       Po
nstallation 
st I
□ 
Reviewed owners’ information in this manual with owner or maintenance personnel and 
instructed 
to 
keep 
for future reference? 
 
□ 
Properly filled in and returned warranty registration card to Boyertown Furnace Co.  Inserted 
 
burner manual instructions with furnace manual for future us