Beckett SLD5125 Manuale Utente
28
Installation and Service Check List
Boiler Model: _______________________ Serial No.: ____________________
Installation Date: ______________________
Installer Name: ________________________
Installation Date: ______________________
Installer Name: ________________________
Phone No.: ____________________
Boiler Installation
□
□
Boiler and burner wired per wiring diagram and National Electric Code? 120VAC wiring
Type_____ Size _____ AWG
Type_____ Size _____ AWG
Boiler level and in solid contact with floor?
Burner sealed to boiler? Mounting nuts tight?
□
Space is large enough to provide required clearances?
□
NFPA 31 Installation of Oil Burning Equipment followed?
□
□
Local, state and national codes, laws, regulations and ordinances followed?
Vent System
□
New vent pipe installed and properly sealed?
Existing chimney and vent system inspected to NFPA 211 and in good condition?
□
□
Vent size checked against furnace manual and codes?
B
r Operation
urne
Burner Model: __________________ Nozzle: _______GPH _______Deg. ____Type_______
□
Burner Pump Pressure: ______________
□
Fuel filter and fuel lines installed and inspected as per burner manual?
□
Air bled from oil piping? Piping checked for leaks?
□
□
Burner started, adjusted and tested per burner manual?
Boiler Operation
□
Limit control tested for proper operation?
Thermostat heat anticipator set per burner manual instructions?
□
□
Boiler observed going through several operational cycles for proper operation?
Po
nstallation
st I
□
Reviewed owners’ information in this manual with owner or maintenance personnel and
instructed
instructed
to
keep
for future reference?
□
Properly filled in and returned warranty registration card to Boyertown Furnace Co. Inserted
burner manual instructions with furnace manual for future us