Toshiba 431B Manuale Utente

Pagina di 64
42
 
4300 Series Ancillary Cabinets Installation and Operation Manual
12.3     IMPORTANT SAFETY INSTRUCTIONS
SAVE THESE INSTRUCTIONS
This manual contains important instructions that should be followed during the installation, maintenance, and 
operation of the MBS to assure safe and proper operation. 
1.  Turn off, lockout, and tagout all power sources before connecting the power wiring to the equipment or 
when performing maintenance.
2.  Verify the MBS is de-energized before removing the cabinet dead fronts.
3.  Verify cables and terminals are de-energized before installing cable in terminals. 
Qualified Personnel ONLY!
Qualified Personnel is one that has the skills and knowledge relating to the construction, installation, operation,
and maintenance of the electrical equipment and has received safety training on the hazards involved (Refer to 
the latest edition of NFPA 70E for additional safety requirements).
Qualified Personnel shall:
1.  Have read the entire operation manual.
2.  Be trained and authorized to safely energize, de-energize, ground, lockout and tag circuits and equipment, 
and clear faults in accordance with established safety practices.
3.  Be trained in the proper care and use of protective equipment such as safety shoes, rubber gloves, hard 
hats, safety glasses, face shields, flash clothing, etc., in accordance with established safety practices.
4.  Be trained in rendering first aid.
For further information on workplace safety visit www.osha.gov.