Manuale UtenteSommarioUltraWAVE BTS 6 Installation and Commissioning Guide1Welcome!9Assumptions, Purpose, and Audience9Related Documentation9Customer Support Services10Conventions Used in this Manual12One - Unpacking and Configuration Verification131-1 Unpacking and Inspecting131-2 Inspect Components and Record Part Numbers151-2.1 Identifying the System Configuration161-2.2 Identifying Module Part and Serial numbers181-3 Verifying and Documenting Cards and Modules201-3.1 Required Equipment201-3.2 RF Subrack Assembly201-3.3 Baseband Subrack Assembly201-4 Internal Cabling Overview22Two - Installation232-1 Site Requirements232-1.1 Environmental Conditions232-1.2 Electrical Requirements242-1.3 Chassis Requirements252-2 Mounting the BTS Chassis262-3 Configuring the E1 or T1 Trunk Card302-3.1 Configure Ground Jumpers on 75 Ohm E1 Cards302-3.2 Configure Cable Length DIP Switch Settings on T1 Cards352-4 Connecting Power and Ground Cables372-4.1 Connecting the Grounding Cable372-4.2 Connecting the Power Supplies372-5 Connecting E1 or T1 Trunk Cables402-5.1 E1 Cables402-5.2 T1 Cables422-5.3 Connecting E1 or T1 Lines432-5.4 Direct Cabling Between Multiple UltraWAVE or WAVEXpress Systems432-5.5 Cabling External BTSs442-6 Connecting Antennas442-6.1 Omni 1 TRX (O1) Configuration452-6.2 Omni 2 TRX (O2) Configuration462-6.3 Omni 3 TRX (O3) Configuration462-6.4 Omni 4 TRX (O4) Configuration462-6.5 Omni 5 TRX (O5) Configuration472-6.6 Omni 6 TRX (O6) Configuration482-6.7 Omni 5 (05) and Omni 6 (O6) 25 Watt Configuration482-6.8 Sectorized Two TRX (S11) Configuration492-6.9 Sectorized Three TRX (S111) Configuration492-6.10 Two Sector Four TRX (S22) Configuration502-6.11 Three Sector Four TRX (S211) Configuration502-6.12 Three Sector Five TRX (S221) Configuration512-6.13 Three Sector Six TRX (S222) Configuration512-6.14 Two Sector Five TRX (S32) Configuration522-6.15 Two Sector Six TRX (S33) Configuration522-6.16 Two Sector Six TRX (S42) Configuration532-6.17 RF Radiation Hazard532-7 Connecting External Alarms552-8 Post Installation Cabling and Checks58Three - Off-Line Commissioning593-1 Pre Off-Line Commissioning603-1.1 Visual Inspection603-2 Off-Line Commissioning the UltraWAVE BTS623-2.1 Connecting the Craft PC to the ICP Processor Card623-2.2 Starting XWindows Using the Craft PC643-2.3 Power-On LED Tests653-2.4 Establishing Serial Communications with the BTS673-2.5 Verifying/Changing Boot Parameters683-3 Software verification using Craft PC703-3.1 Verifying the Current Software Version and Patch Level703-3.2 Checking the Flash Version Number703-3.3 Running E1 or T1 POST Diagnostics713-3.4 Verifying Telnet Communications with the BTS over Ethernet723-3.5 Running TRX POST Diagnostics733-3.6 Reviewing POST Results753-3.7 Rebooting the BTS after Running POST763-3.8 Terminating Serial Communications with the BTS763-4 Exiting XWindows on the Craft PC773-5 Upgrading the BTS Software Version (Flash)783-6 Post Off-Line Commissioning80Four - Off-Line Commissioning of a Daisy Chain814-1 Prerequisites to Daisy Chaining814-2 Setting the Abis LAPD Signaling Timeslot82Five - On-Line Commissioning835-1 Pre On-Line Commissioning Requirements845-2 On-Line Commissioning855-3 Antenna Cabling and Power Verification905-3.1 Voltage Standing Wave Ratio (VSWR) Check905-3.2 Verifying BTS RF Performance without Racal905-3.3 Verifying TRX Output Power905-3.4 RX BER Measurements915-4 Post On-Line Commissioning Procedures93Checklist 1 - Site Readiness Checklist95Checklist 2 - Installation Checklist97Checklist 3 - Commissioning Checklist99Dimensioni: 1,87 MBPagine: 108Language: EnglishApri il manuale