Manuale UtenteSommarioImportant Safety Instructions5General Safety5Voltages5AC Input Voltages5DC Input/Output Voltages5Battery (if equipped)6Personal Protective Equipment (PPE)7Maintenance and Servicing Procedures8General8Dual Hazardous Input Power Sources8Circuit Card Handling8STATIC WARNING9CHAPTER 1. GENERAL INFORMATION AND INSTALLATION ACCEPTANCE CHECKLIST11Customer Documentation Package11Bound System Installation Manual11Bound System Operation Manual11Bound ACU+ Controller Operation Manual11USB Drive with All Customer Documentation11System Packaging11Power and Control Sub-Rack (List 11, 12)12General12Rectifiers12Temperature Probes (List 98, 99)12DC Load Distribution Sub-Rack (List 21, 22, 23, 24)13General13Battery Tray (List 91, 92)14General14Recommended Tools and Test Equipment15Installation Acceptance Checklist16General16Checklist –Factory Integrated System (List R1, R2)16Chapter 2. Installing the System16Chapter 3. Making Electrical Connections16Chapter 4. Installing the Rectifiers16Chapter 5. Initially Starting the System16Checklist – Customer Integrated System (ship loose)17Chapter 2. Installing the System17Chapter 3. Making Electrical Connections17Chapter 4. Installing the Rectifiers17Chapter 5. Initially Starting the System17CHAPTER 2. INSTALLING THE SYSTEM18General Requirements18Inspecting the Equipment and Storing for Delayed Installations19Inspecting the Equipment19Storing for Delayed Installation19Securing the IT Rack to the Floor19Factory Integrated Systems (List R1, R2)19Procedure19Installing Individual Sub-Racks into Cutomer Provided IT Rack (not applicable with List R1, R2)20Customer Supplied IT Rack Guidelines20Installing the Sub-Racks20Procedure20Electrically Interconnecting the Sub-Rack(s)22CHAPTER 3. MAKING ELECTRICAL CONNECTIONS23Important Safety Instructions23Wiring Considerations23Torque23Output Ground Configurations23Cable Routing23When System is Furnished in a Factory Provided IT Rack (List R1, R2)23When System Components are Furnished Loose to be Installed in a Customer Furnished IT Rack25Tasks to Be performed for Customer Integrated Systems27Grounding27Sub-Rack Grounding (Frame Ground)27NPG Configurations Only: Return Busbar (-Bus) Grounding Connection27HRMG Configurations Only: Bus Grounding Connection27Sub-Racks Electrical Interconnections31Connecting the Load Distribution Sub-Rack(s) to the Power and Control Sub-Rack31Procedure31Connecting the Battery Tray(s) to the Power and Control Sub-Rack31Procedure31Connecting the Battery Tray Control and Alarm Harness to Other Battery Trays and/or to the Power and Control Sub-Rack31Procedure31Tasks to Be Perform for All Installations35Grounding35IT Rack Grounding (Frame Ground)35Conduit Grounding (Frame Ground)35AC Input Power Connections38DC Load Distribution Electrical Connections to List 21-24 DC Load Distribution Sub-Rack(s) (if furnished)39HRMG (High Resistance Midpoint Ground) Configuration39NPG (Negative Pole Ground) Configuration39Installing Battery Sub-Trays in List 91 and 92 Battery Tray(s) (if furnished)41Battery Manufacturer Information41Installing Battery Sub-Trays41Procedure41External Battery Connections (if required)43IB2 (ACU+ Controller Interface Board) Connections (if required)45Digital Inputs and Programmable Relay Outputs45Digital Inputs45Programmable Relay Outputs45Temperature Probes46ACU+ Controller Ethernet Connection (if required)46Power and Control Sub-Rack Bulk Output Connections (if required)50CHAPTER 4. INSTALLING THE RECTIFIER MODULE51Procedure51CHAPTER 5. INITIALLY STARTING THE SYSTEM52Initial Startup Preparation52Initially Starting the System53Procedure53ACU+ Controller Initialization54Procedure54Verifying the Configuration File56Procedure56Changing Battery Capacity Rating in the ACU+56Procedure56Checking Basic System Settings57Procedure57Configuring the ACU+ Identification of Rectifiers59Procedure59Checking the System Shutdown Circuit60Procedure60Checking System Status60Procedure60Final Steps61Procedure61Reference Documents61Dimensioni: 5,44 MBPagine: 64Language: EnglishApri il manuale