Manuale UtenteSommario1 AIR CPE system overview42.1 Step 1: Determining Base station direction for aiming antenna52.2 Step 2: Finding suitable antenna site62.3 Step 3: Installing mast92.4 Step 4: Assembling antenna on the ground102.5 Step 5: Attaching antenna to mast102.6 Step 6: Routing RG6 cable(s)112.6.1 F-Connector installing instruction122.7 Step 7: Attaching Transceiver (LNB) to antenna132.8 Step 8: Aiming and fine-tuning antenna143 Troubleshooting Check List for Initial Installation165 APPENDIX A: F-connector installation manual176 APPENDIX B: Transceiver specification20Table 1: CPE polarization13Table 2: Transciever specification21Figure 1: AIR CPE connections4Figure 2: Clear line of sight5Figure 3: Bad line of sight6Figure 4. CASE1: suitable antenna site installation7Figure 5: CASE2: suitable antenna site installation7Figure 6: CASE3: unsuitable antenna site installation8Figure 7: Mounting sites9Figure 8: Antenna assembly10Figure 9: AIR CPE connections 211Figure 10: F-connector seal12Figure 11: CPE powering 114Figure 12: CPE powering 215Figure 13: F-connector installation manual19Figure 14: AIR CPE20Dimensioni: 4,84 MBPagine: 20Language: EnglishApri il manuale