Lucent Technologies 555-670-111 ユーザーズマニュアル

ページ / 1082
MERLIN LEGEND Communications System Release 7.0
System Programming  
555-670-111  
Issue 1
April 1999
Programming Procedures 
3-43
System Operator Positions 
3
NOTE:
When you change an extension to an operator position, or vice versa, the 
system returns the port (extension jack) type of that extension to the factory 
setting. You must reprogram lines and any features for that telephone or 
console. You may also need to change any attached accessory equipment 
and optional features.
Primary Operator Positions
3
The primary operator position is the extension to which your call is directed when 
0
 is dialed on a System Access button. The first extension jack on the first MLX 
module in your system is assigned as the primary operator position. If your 
system has QCC operator positions, this position must be changed from the 
factory setting (DLC) to a QCC operator position. (The primary operator extension 
cannot be changed from the first extension on the first MLX module.)
QCC System Operator Positions
3
This procedure applies to Hybrid/PBX systems only. Note that both QCC and DLC 
operator positions can be assigned with this procedure, although its primary 
purpose is to assign QCC operator positions.
QCC operators serve as central answering positions for all incoming calls. 
Incoming calls are held in the QCC queue and are directed to each QCC operator 
in a prioritized sequence. The calls are received one at a time, regardless of the 
number of incoming calls to the system.
Additional QCC operator positions can be assigned only to the first and fifth 
extension jacks of the MLX modules. A maximum of four QCC operator positions 
can be assigned. Use this procedure to specify QCC operator positions that serve 
as central answering positions for all incoming calls.
NOTE:
If you want to add or remove QCC operator positions, the following 
conditions apply:
If other QCC positions remain in your system, the primary QCC 
operator position cannot be removed.
When QCC operator positions are added, the primary QCC operator 
position should be the first one added.
If QCC operator positions are being removed, the primary QCC 
operator position must be the last one removed.