Crane EE-4109 ユーザーズマニュアル

ページ / 11
 
LIST OF MAIN PARTS 
 
Fig. 1 (Humidifier Base)  
 
1.
  Night Light Switch  
2.
  Control Knob 
3.
  Power Cord 
4.
  Water Basin 
5.
  Power Indicator Lights 
 
 
 
                 3      5           1      2    4     5 
Fig. 1
 
Fig. 2 (Top of Water Tank) 
 
6.
  Mist Outlet Channel  
7.
  Water Tank Handle  
 
 
 
8
Fig. 2 
Fig. 3 (Water Basin) 
 
9.
  Nebulizer 
10.
 Mist Chamber  
11.
 Fan Vent 
12.
 Valve Opener  
13.
 Water Level Sensor 
 
 
      13       9     10     11           12 
Fig. 3
 
Fig. 4 (Bottom of Water Tank) 
 
14.
 Water Tank Valve  
15.
 Water Tank Cap  
16.
 Mist Outlet Channel  
 
 
                       14     15        16 
Fig. 4 
Fig. 5 (Mist Lid) 
 
17.
 Mist Lid  
18.
 Mist Output Slots  
 
 
 
 
                 17                    18 
Fig. 5