Burnham BV ユーザーズマニュアル

ページ / 28
4
A.
  SPECIAL PRECAUTIONS
1.   Disconnect power supply before making wiring 
connections to prevent electrical shock and 
equipment damage. All units must be wired strictly 
in accordance with wiring diagram furnished with 
unit.
2.   Units should not be installed in atmospheres where 
corrosive fumes or sprays are present.
3.   Units must not be installed in potentially explosive 
or fl ammable atmospheres.
4.   Be sure no obstructions block air intake or air 
discharge of unit heater.
5.   Do not install unit above recommended maximum 
mounting heights (see Table 1) or below the 
minimum height of eight feet.
II.  GENERAL INFORMATION
A.
  INSTALLATION LIMITATIONS
 
Installation and service instructions in this manual are 
applicable to the steam/hot water unit heaters which 
should be installed in their proper applications for their 
most effective function as overhead heating units. The 
copper coils are warranted for operation at steam or 
hot water pressures up to 150 psig, and/or temperatures 
up to 375°F. Canadian Standards Association (CSA) 
requirements state that explosion-proof units may not 
be used with a fl uid temperature in excess of 329°F and 
still maintain their explosion-proof rating, for national 
electric code ignition temperature rating T3B for grain 
dust.
B.
  INSPECTION ON ARRIVAL
1.   Inspect unit upon arrival. In case of damage, report 
immediately to transportation company and your 
local Burnham Hydronics Representative.
2.   Check rating plate on unit and motor to verify that 
power input and motor specifi cation meet available 
electric power at point of installation.
3.  Inspect unit received for conformance with 
description of product ordered (including 
specifi cations where applicable).
III.  INSTALLATION
G
N
I
N
R
A
W
D
R
A
U
G
N
A
F
T
E
L
T
U
O
E
V
O
M
E
R
T
O
N
O
D
.
S
T
I
N
U
V
B
L
E
D
O
M
M
O
R
F
Figure 1:  Horizontal Air Delivery
B.
 UNIT SUSPENSION
 
Horizontal Delivery Units, Model BH Series
 
All horizontal delivery units have two tapped holes 
(3/8”-16) in the top for unit suspension. Piping 
support hangers or clamps are recommended and 
should be placed as close to the unit heater as 
possible. For other models, independent suspension 
can be made with threaded rods, pipes, or ceiling 
hanger brackets.