Thermo Products CMA2-75N ユーザーズマニュアル

ページ / 55
All installations and services must be performed by qualified service personnel. 
B.  BASE INSTALLATION 
 
 
1. Combustible Floor Base Model: 70 BASE 
 
Use the base bottom panel as a template to mark floor opening locations (see 
Figure 2). Cut a square opening in the floor for the supply air connector duct. Cut 
the opening 1-inch larger than the square template opening. (duct requires 1-inch 
clearance to combustible floor).   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Figure 2. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Figure 3. 
 
After cutting openings in the floor, place the bottom panel in position. Mark the 
square opening location on the distribution duct at the connection point of the 
 
12