Honeywell R7184U ユーザーズマニュアル

ページ / 8
69-1233—2    G.R. Rev. 5-00 
www.honeywell.com
Home and Building Control
Home and Building Control
Honeywell Inc.
Honeywell Limited-Honeywell Limitée
Honeywell Plaza
155 Gordon Baker Road
P.O. Box 524
North York, Ontario
Minneapolis, MN  55408-0524
M2H 3N7
R7184A,B,P,U INTERRUPTED ELECTRONIC OIL PRIMARY
Printed in U.S.A. on recycled 
paper containing at least 10% 
post-consumer paper fibers.
7. Listen for spark after burner turns on 
(after a 2 second delay.
Ignition is off.
Spark ignitor could be defective. Check for line 
voltage at ignitor terminals. If line voltage is present, 
replace R7184.
Ignition is on.
Go to step 8.
Ignition is on, but no 
oil is  being sprayed 
into the combustion 
chamber.
Wait for Valve On Delay to complete (R7184B,P, and 
U). Check oil valve, oil valve wiring, pump and oil 
supply.
8. Check indicator light after flame is 
established, but before oil primary  
control locks out.
Indicator light is on 
until the control locks 
out and starts flashing 
during lockout.
Replace R7184.
Indicator light stays 
off.
Go to step 9.
9. Check cad cell sighting for view of 
flame.
Disconnect line voltage power and 
open line switch.
Unplug cad cell and clean cad cell 
face with soft cloth. Check sighting 
for clear view of flame. Place cad cell 
back in socket. 
Reconnect line voltage power and 
close line switch.
Start burner.
Burner locks out.
Go to step 10.
Burner keeps running. System is okay.
10. Check cad cell.
Disconnect line voltage power and 
open line switch.
Remove existing cad cell and replace 
with new cad cell.
Disconnect all wires from thermostat 
terminals to be sure there is no call 
for heat.
Reconnect line voltage power and 
close line switch.
Expose new cad cell to bright light, 
such as a flashlight.
Indicator light is on.
Place control back on burner. Go to step 6.
Indicator light is off.
Go to step 11.
11. Check cad cell bracket assembly.
Disconnect line voltage power and 
open line switch.
Remove cad cell wires from quick-
connect connectors on the R7184 
and leave control leadwires open.
Apply power to device.
Place jumper across cad cell 
terminals after burner motor turns on.
Indicator light is on.
Replace cad cell bracket assembly. Refer to 
TRADELINE® Catalog for bracket part numbers.
Indicator light is off.
Replace R7184.
Table 5. Troubleshooting Information (Continued).
Procedure
Status
Corrective Actions