Sterling SDA 150-380 ユーザーズマニュアル

ページ / 52
 
 
Cabinet Series Dehumidifying Dryer 
 
37 
 
Preventative 
Maintenance 
Checklist 
       
Dehumidifying Dryer Systems
 
 
System model # 
 
Serial # 
Every week 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/
By 
Date/
By 
Date/
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Inspect all filters for 
wear, replace/clean 
if dirty or worn. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Check air regulator 
to make sure pres- 
sure is 60-80 psi 
(413.7 to 551.6 kPa 
 /4.1 to 5.5 bars). (If 
applicable) 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Every month 
Jan  Feb  Mar
Apr May Jun
Jul  Aug Sep  Oct  Nov Dec
Lock out electrical 
power and inspect 
electrical wiring for 
integrity. 
 
 
 
 
 
 
 
 
 
 
 
 
Lock out electrical 
power and check 
heater elements for 
continuity using an 
ohmmeter. 
 
 
 
 
 
 
 
 
 
 
 
 
Check dew point 
and temperature 
tracking with an 
external dew point 
monitor and 
pyrometer. 
 
 
 
 
 
 
 
 
 
 
 
 
Visually inspect the 
shifting of the airflow 
valve during one 
cycle. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Every year 
Next scheduled 
inspection 
Actual inspection 
Date/By 
Next scheduled 
inspection 
Actual inspection 
Date/By
 
Inspect desiccant. Replace 
if brown or broken.
 
 
 
 
 
 
Every two years 
Scheduled  
replacement date 
Actual replacement 
Date/Work done by 
Scheduled 
replacement date 
Actual replacement 
Date/Work done by
 
Replace desiccant. 
 
 
 
 
 
- Photocopy this page for your maintenance records -