Wayne-Dalton 5120 ユーザーズマニュアル

ページ / 38
Tools Needed:
10
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. 
To find your Wayne-Dalton dealer; refer to your local yellow pages / business listings or go to Find a dealer area online at 
www.wayne-dalton.com
hEADROOM REqUIREMENT
If you just removed your existing door or you are installing a 
new door, complete all steps in PREPaRING ThE OPENING. 
To ensure secure mounting of track brackets, side and center 
brackets, or steel angles to new or retro-fit construction, it is 
recommended to follow the procedures outlined in DasMa 
Technical Data sheets #156, #161 and #164 at www.dasma.
com.
The inside perimeter of your garage door opening should be 
framed with wood jamb and header material. The jambs and 
header must be securely fastened to sound framing members. 
It is recommended that 2” x 6” lumber be used. The jambs 
must be plumb and the header level. The jambs should extend 
a minimum of 12” (305 mm) above the top of the opening 
for TorqueMaster counterbalance systems. For low headroom 
applications, the jambs should extend to the ceiling height. 
Minimum side clearance required, from the opening to the 
wall, is 3-1/2” (89 mm).
IMPORTANT:  Closely  inspect  jambs,  header  and  mounting 
surface. any wood found not to be sound, must be replaced.
For  TorqueMaster  counterbalance  systems,  a  suitable 
mounting surface (2” x 4”) must be firmly attached to the 
wall, above the header at the center of the opening.  
NOTE: Drill a 3/16” pilot hole in the mounting surface to avoid 
splitting the lumber. Do not attach the mounting surface with 
nails.
weather Seal (May Not be Included): 
Cut or trim the weather seal (if necessary) to the header and 
jambs. 
for quick install track: align the header seal with the inside 
edge of the header and temporarily secure it to the header 
with equally spaced nails. Next, fit the jamb seals up tight 
against the header seal and flush with the inside edge of the 
jamb. Temporarily secure the jamb seals with equally space 
nails approximately 12” to 18” apart. This will keep the bottom 
section from falling out of the opening during installation.
for fully adjustable track: align the header seal 1/8” to 1/4” 
inside the header and temporarily secure it to the header with 
equally spaced nails. Next, fit the jamb seals up tight against 
the header seal and 1/8” to 1/4” inside the jamb. Temporarily 
secure the jamb seals with equally space nails approximately 
12” to 18” apart. This will keep the bottom section from falling 
out of the opening during installation.
NOTE: Do not permanently attach weather seal to the jamb 
at this time.
hEADROOM  REqUIREMENT:  headroom  is  defined  as  the 
space needed above the top of the door for tracks, springs, 
etc. to allow the door to open properly. If the door is to be 
motor operated, 2-1/2” (64 mm) of additional headroom is 
required.
NOTE: 6” lhR Conversion kit is available for 12” Radius only. 
Contact your local Wayne-Dalton dealer.
bACkROOM  REqUIREMENT:  Backroom  is  defined  as  the 
distance needed from the opening back into the garage to 
allow the door to open fully.
Preparing the Opening
TRACk TyPE
TorqueMaster
®
12” Radius track
11” (279 mm)
6” lhR kit
6” (152 mm)
DOOR hEIghT
TRACk
MANUAl 
lIfT
MOTOR 
OPERATED
7’0”
12” Radius
98” 
(2489 mm)
125” 
(3175 mm)
8’0” 
12” Radius
110” 
(2794 mm)
137” 
(3480 mm)
WEaThER sEal
bACkROOM REqUIREMENT
hEaDROOM
BaCkROOM
DOOR
WIDTh
DOOR 
hEIGhT
lEVEl hEaDER
PluMB jaMBs
hEaDER BOaRD 
2” x 6” luMBER 
PREFERRED
suITaBlE MOuNTING 
suRFaCE 2” x 6” 
luMBER MINIMuM
P5
Recommended 
tools from 
page 5
hEaDER
jaMB
jaMB
quICk INsTall TRaCk
jaMB
WEaThER 
sEal