Chamberlain WD962KPEV ユーザーズマニュアル

ページ / 48
18
Install the door bracket
8
Installation
ONE-PIECE DOORS
Option B
8.1B
   Center the door bracket on the top 
of the door, in line with the header 
bracket as shown. 
8.2B
   Mark either the left and right, or the 
top and bottom holes.
  Metal 
Doors: 
 
 
•   Drill 3/16" pilot holes and fasten 
the bracket with the self-threading 
screws (H16) provided.
  Wood 
Doors: 
 
 
•   Drill 5/16" holes and use 5/16"x2" 
carriage bolts, lock washers and nuts 
(not provided) or 5/16"x1-1/2" lag 
screws (not provided) depending on 
your installation needs.
 
   NOTE: The door bracket may be 
installed on the top edge of the door 
if required for your installation. (Refer 
to the dotted line optional placement 
drawing.) 
For a door with no exposed framing, or for the 
optional installation, use lag screws 5/16"x1-1/2" 
(not provided) to fasten the door bracket.
Vertical 
Centerline 
of Garage 
Door
Optional 
Placement 
of Door 
Bracket
Door Bracket
Header Bracket
Header Wall
2x4 Support
(Finished Ceiling)
H16
Door 
Bracket
Top of Door 
(Inside Garage)
Top Edge of 
Door
Optional 
Placement
Optional 
Placement
Top Edge 
of Door
Top of Door 
(Inside Garage)
Door 
Bracket
Carriage Bolt 5/16"x2" 
(not provided)
Nut 5/16"-18
Lock Washer 5/16"
Metal Door
Wood Door