Emerson Process Management 3400 ユーザーズマニュアル

ページ / 398
 172
Maintenance logs and reports (Logs/Reports Menu)
Section 5: Startup and meter configuration
 Reference, Installation, and Operations Manual
June 2013
3-9000-743 Rev S
2.
Click the 
Start
 button and the Log File Pathname dialogs appears. 
Figure 5-23  Log file pathname   
You may choose a name for the Maintenance log or use the default name based on the 
Meter Name and PC date and time that is suggested. Change the name or default 
location if desired and click the 
SAVE
 button to apply your changes. The Log file shows 
the file and location of the Maintenance log being generated.
3.
Daniel MeterLink begins to collect the information requested from the meter. Time 
Remaining shows the time left in the data collection period in a 
Day: Hour:Minute:Second 
format. A progress bar at the bottom of the dialog shows the 
progress for each record being collected. The table is updated after each record is 
collected (
).