Mitsubishi Electronics MS-AWA ユーザーズマニュアル

ページ / 28
18
(2) Time chart
OFF Time
Time
ON
Operational frequency 
of the compressor
Commanded
to open
Standard 
opening
 degree
Opening degree is 
corrected according
to discharge 
temperature.
Positioning
Air conditioner ON
Air conditioner OFF
(thermostat off)
LEV opening degree
about 5 minutes     <COOL, DRY>
about 15 minutes   <HEAT>
(3) Control data
06
05
04
03
02
01
LEV opening degree
A(target discharge temperature)
B
C
D
E
F
30
50
70
Operational frequency of the compressor
90
110
130
 (Hz)
A
50/45
B
53/52
C
60/59
D
66/68
E
70/76
F
70/76
(a) Reference value of target discharge temperature
(COOL/HEAT (MUZ)ºF)
54/49
58/58
64/66
70/74
70/82
70/85
MUZ-A09/12
MUZ-A15/17
MUY-A15/17
60/60
60/63
60/65
63/67
64/70
67/70
MUZ-A24
MUY-A24
Applied model
MUZ-A09/12/15/17/24
MUY-A15/17/24
OBT16--1.qxp  06.3.29 11:20 AM  Page 18