Beko BK 6300 ユーザーズマニュアル
26
Installation of outdoor unit
Step four: connect indoor and outdoor pipes
1. Remove the screw on the right han-
dle of outdoor unit and then remove
the handle.
dle of outdoor unit and then remove
the handle.
2. Remove the screw cap of valve and
aim the pipe joint at the bellmouth of
pipe.
aim the pipe joint at the bellmouth of
pipe.
3. Pretightening the union nut with
hand.
hand.
4. Tighten the union nut with torque
wrench by referring to the sheet
below.
wrench by referring to the sheet
below.
handle
screw
gas pipe
liquid pipe
liquid
valve
valve
gas valve
union nut
pipe joint
Hex nut diameter Tightening torque
(N.m)
ĭ
ĭ
ĭ
ĭ
ĭ
ĭ
ĭ
30~40
40~55
60~65
70~75
40~55
60~65
70~75
15~20
6WHS¿YHFRQQHFWRXWGRRUHOHFWULFZLUH
1. Remove the wire clip; connect the power connection wire and signal control
wire (only for Heat pump type) to the wiring terminal according to the color;
fix them with screws.
wire (only for Heat pump type) to the wiring terminal according to the color;
fix them with screws.
Indoor unit connection
POWER
N(1)
2
3
L
L
N
N
blue
blue
black brown
brown
(black)
(black)
yellow-
green
green
yellow-
green
green
18
、24K Heat pump type: