Bryan Boilers Triple-Flex 150 ユーザーズマニュアル

ページ / 81
 
Date:  
8-4-2010 
 
Revision: 0 
 
Form:  
2396
 
Note: 
Please read and save for future reference the 
entire instruction manual before attempting 
installation of or starting the unit.  Insurance and 
local or state regulatory codes may contain 
additional or more stringent requirements than 
those contained in this manual.  Installation must 
conform to these codes and any other authority 
having jurisdiction.  This instruction manual shall 
be posted and maintained in a legible condition. 
1.1 B
OILER 
F
OUNDATION
 
Before uncrating, the boiler location should be 
prepared.  The boiler should set upon a good 
level concrete floor.  If the boiler is not level or 
the floor is not in good condition, a concrete 
foundation should be built, the dimensions being 
larger than the outside dimensions of the boiler 
base.  A 4” high housekeeping pad is 
suggested. 
 
WARNING: 
Do not install boiler on combustible 
flooring. 
 
1.2 C
LEARANCES
 
See Table 1 for minimum clearances to walls, 
ceilings, or obstructions.  The clearances in 
Table 1 are intended as a general 
recommendation only.  Local codes must be 
applied to specific installations and the minimum 
clearances established accordingly.  Provisions 
must also be made for service, accessibility and 
clearance for piping and electrical connections.  
Do not obstruct combustion air and ventilation 
openings with piping or any other construction.  
All boilers must be installed in a space that is 
large compared to the boiler. 
                                   
NOTE: 
These boilers should be installed in a room that 
is large compared to the size of the boiler.  They 
are not intended for alcove installation and are 
suitable for installation on non-combustible 
flooring only.  Adhere to all applicable local 
codes regarding boiler installation and 
clearances. 
 
1.2.1 M
INIMUM 
C
LEARANCES TO 
C
OMBUSTIBLE 
S
URFACES
 
 
Figure 1 Minimum Clearances 
 
DIM. Description 
Triple-Flex 
150 - 300 
Clearance Above Top of 
Boiler 
18” 
B Right 
Side 
18” 
From Chimney or Vent 
Collector Measured 
Horizontally 
18” 
Left Side – Tube Access 
Side On Standard 
Construction 
27” 
From Chimney or Vent 
Collector Measured 
Vertically 
18” 
Front of Boiler – Gas Train 
& Control Panel End 
48” 
Rear of Boiler Opposite 
Gas Train & Control Panel 
End 
18” 
Table 1 Minimum Clearance 
 
 
1.3 R
ECEIVING 
T
HE 
B
OILER
 
 
The boiler is shipped from the factory with (4) 
shipping feet/legs bolted to the skids.  These are 
provided to facilitate unloading/moving with a 
forklift.  Lifting lugs are also provided to enable 
over-head lifting.  The shipping feet/legs MUST