Energy Tech Laboratories CL Series ユーザーズマニュアル

ページ / 52

I.  General Information
A.
  INSPECT SHIPMENT carefully for any signs of 
damage.
1.  ALL EQUIPMENT is carefully manufactured, 
inspected and packed. Our responsibility ceases 
upon delivery of crated boiler to the carrier in good 
condition.
2.  ANY CLAIMS for damage or shortage in shipment 
must be filed immediately against the carrier by 
the consignee. No claims for variances from, 
or  shortage in orders, will be allowed by the 
manufacturer unless presented within sixty (60) 
days after receipt of goods.
B.
  LOCATE BOILER in front of final position before 
removing crate.  See Figures 1A thru 1D.
1.  LOCATE so that smoke pipe connection 
to   chimney will be short and direct. BOILER 
IS SUITABLE FOR INSTALLATION ON 
COMBUSTIBLE FLOOR. Boiler cannot be 
installed on carpeting.
2.  FOR BASEMENT INSTALLATION, provide a 
solid base, such as a concrete pad, if floor is not 
level, or  if water may be encountered on floor 
around boiler.
3.  PROVIDE SERVICE CLEARANCE of at least 24” 
on top of boiler for cleaning flueways.  Provide at 
least 24" on right side of boiler for removal of rear 
tankless heater. Provide at least 24” clearance from 
front jacket panel for servicing. 
4.  For minimum clearances to combustible materials. 
See Figure 2.
C.
  PROVIDE AIR SUPPLY AND VENTILATION  to 
accommodate proper combustion. If natural ventilation 
is inadequate, provide a screened opening or duct from 
the boiler room to the outside.  The opening or duct 
must be sized so the boiler input will not exceed 4,000 
BTUH/Sq. In. of free area.  If other air consuming 
appliances are near the boiler, the air inlet should be 
larger. Consult respective manufacturers.
Table of Contents
 
I.  General Information .................................... 
 II.  Installation Instructions .............................. 8
 III. Indirect Water Heater Piping .................... 2
 IV. Operating & Service Instructions ............ 2
 V.  Maintenance and Service Instructions. ... 0
 VI. Boiler Cleaning .......................................... 
    Trouble Shooting
   
Carlin 0200 ............................................. 6
   
Riello 0 Series ....................................... 6 
 VII.  Repair Parts .............................................7
 VIII. Appendix
      Low Water Cut Off ..................................5
      Burner Specifications ............................6