Regency E33-NG ユーザーズマニュアル

ページ / 32
8
E33 FPI Direct Vent Gas Insert
VENTING
THE APPLIANCE MUST NOT BE 
CONNECTED TO A CHIMNEY FLUE 
SERVING A SEPARATE SOLID FUEL
BURNING APPLIANCE.
This appliance is designed to be attached to 
two 3" (76mm) co-linear aluminium fl ex running 
the full length of the chimney. The fl ue length 
must be a minimum length of 8 '  (2.44m) and 
a maximum of 35' (10.7m). See chart  above 
for minimum distances from roof. Periodically 
check that the vent is unrestricted.
Masonry chimneys may take various contours 
which the fl exible liner will accommodate. 
However, keep the fl exible liner as straight 
as possible
, avoid unnecessary bending.
Part # 
Description
948-305 
3" Flex - 35 ft.
946-529 
FPI Co-linear DV Vertical 
 Termination 
Cap
Alternate Approved Caps
980 Vertical 
Termination 
Cap
991 High 
Wind 
Cap
923GK 3" 
Co-linear 
Adaptor 
with 
 fl 
ashing
GAS CONNECTION 
GAS CONNECTION WARNING:
Only persons licensed to work 
with gas piping may make the 
necessary gas connections to 
this appliance.  
1)  If the appliance is to be installed into an 
existing chimney system, thoroughly clean 
the masonry or factory built fi replace.
2)  The appliance is provided with an opening 
on the left hand side of the control compart-
ment. A 3/8" NPT gas supply pipe must be 
brought near this inlet hole. 
In areas of consistently high winds, we recom-
mend using the Simpson Dura-Vent System 
(923GK adapter and 991 high-wind cap).
The Air Intake pipe must be attached to the inlet 
air collar of the termination cap.
INSTALLATION 
3)  Locate the center point where the vent will 
pass through the chimney above the ap-
pliance. Move the appliance into the exact 
location where it is to be installed.  Ensure 
that the Insert is level.
FLUE LINER 
INSTALLATION
1)  Cut the fl ex liner as required.
 
2)  Mark the end of one liner to indicate 
Exhaust.
3)  Connect the other end of the above liner to 
the exhaust side of the termination adap-
tor, seal connection with high temperature 
silicone. Secure with gear clamp.
4)  Connect the 2nd liner to the inlet side of the 
adaptor, seal connection with high tempera-
ture silicone. Secure with gear clamp.
5) Install 
fl 
ashing.
6)  Insert both liners into chimney, passing 
through the damper opening.
7) Install 
termination 
cap.
8) Connect 
the 
marked end of the liner to the 
exhaust  collar of the vent connector plate 
marked with an "E", seal connection with 
high temperature silicone. Secure with gear 
clamp.
9)  Connect the 2nd liner to the intake collar, seal 
connection with high temperature silicone. 
Secure with gear clamp.
NOTE:  
1)
  Final gas connection should be made after 
unit is in place to avoid damage to line when 
pushing the unit into position.
2)  Mill-pac may be used instead of high 
tempture silicone and screws may be used 
instead of gear clamps at connections of 
liner to inlet and vent collars.
10) Align vent connector plate with guides on 
unit.  
11)  Slide unit into masonry opening, while ensur-
ing that the slot at the rear of the connector 
plate mates up with the hold down plate on 
the unit.
12) Secure with Screw.