Sharp PN-K322B ユーザーズマニュアル

ページ / 41
40
E
•  When installing, removing or moving the monitor, ensure 
that this is carried out by at least 2 people.
•  Be sure to use a wall-mount bracket designed or 
designated for mounting the monitor.
•  This monitor is designed to be installed on a concrete wall 
or pillar. Reinforced work might be necessary for some 
materials such as plaster / thin plastic board / wood before 
starting installation. 
This monitor and bracket must be installed on a wall which 
can endure at least 4 times or more the weight of the 
monitor. Install by the most suitable method for the material 
and the structure.
•  To attach a VESA-compliant mounting bracket, use M6 
screws that are 5/16 inch (8 mm) to 3/8 inch (10 mm) 
longer than the thickness of the mounting bracket.
•  Do not use an impact driver.
•  When moving the monitor, be sure to hold it with the unit 
bottom and the side of unit. Do not hold the LCD panel or 
corners. This may cause product damage, failure, or injury.
•  Do not use any screw holes other than VESA holes for 
installation.
Mounting Precautions  
(For SHARP dealers and service engineers)
n
Removing the stand
Caution
•  The stand is only for use with the monitor.  
Do not use with any other devices.
•  The stand is heavy. Take care not to let it fall.
1.  Spread a thick, soft cloth (blanket, etc.) that will prevent 
damage to the LCD panel on a stable flat surface where 
the entire monitor can be placed, and place the monitor 
with the LCD panel face down on the cloth.
2.  Remove the screws(x4) that fasten the stand, and 
remove the stand.
 
n
Toppling prevention
Caution
•  To reduce the risk of injury and damage caused by the 
product toppling or falling in an earthquake or similar 
situation, take measures to prevent toppling and falling.
•  If the wall or platform on which the monitor is installed is 
not sufficiently strong, the effectiveness of the toppling/
falling prevention measures will be severely compromised. 
Reinforce the wall or platform as needed. 
The toppling/falling prevention measures are intended to 
reduce the risk of injury and damage in an earthquake, 
however, the effectiveness of the measures is not 
guaranteed in all earthquakes.
•  Before implementing the toppling prevention measures, 
complete all connections.
Secure to wall or post
1.  Attach a commercially available eye bolt (a bolt shaped to 
allow attachment of a string or cord) to the wall or post.
Verify that the eye bolt is attached firmly and does not come out.
Commercially available 
eye bolt
(bolt shaped to allow 
attachment of a string 
or cord)
• Top of monitor
2.  Attach the supplied anti-toppling clamps (x2) to the stand 
pedestal with the screws (M4 x 10) (x2).
• Back of monitor
3.  Run a commercially available cord of sufficient strength 
through the anti-toppling clamps and the eye of an eye 
bolt attached to the wall or a post to secure the monitor.
• Top of monitor
Commercially 
available cord
• Back of monitor