Multiquip gb43sc ユーザーズマニュアル

ページ / 54
PAGE 18 — GLOBUG 4-SPOT — OPERATION AND PARTS MANUAL — REV. #3  (12/15/08)
GLOBUG 4-SPOT —  SETUP
CAUTION - Read Manual
Please read this entire manual carefully
before attempting to operate the GloBug.
Failure to read this manual could cause
damage to the GloBug and serious injury
to the operator.
GloBug Setup
1. Using the T-handle (Figure 7) place the GloBug on a
firm level surface so that it will not slide or turn over.
3. Lift up on each outrigger (2) from its stow  position, rotate
backwards and place it in the deployed position, as shown
in Figure 9. The outriggers will automatically lock in place
once they touch the ground,
Figure 7.  T-Handle (Directional Control)
2. To apply the parking brake (Figure 8), step on the brake
pedal and pull back on the T-handle. This will lock the
rear wheels. For additional safety use chock blocks to
prevent rolling.
PARKING
BRAKE SET
STEP DOWN
ON BRAKE PEDAL
Figure 8.  Parking Brake (Set Position)
AC
CIR
CU
IT
BR
EA
KE
R
AC
CIRCUIT
BREAKER
120
/24
0V
120/240V
30A
30A
120
V
30A
20A
20A
0N
OFF
IDL
E
CO
NT
RO
L
OP
ER
AT
ION
SW
ITC
H
ON
OF
F
FU
LL
PO
WE
R
SW
ITC
H
120
V
120
V/2
40V
120
V
OF
F
OFF
21
A
21A
GA
-6H
6000
OUTRIGGERS
DEPLOYED
STOW
POSITION
Figure 9.  Outriggers (Deployed Position)
Lamp Assembly
1. Screw the lamp into the socket (use 400 watt metal-
halide type lamp).  Always allow a sufficient amount of
time for the lamp to cool down before changing. See
Figure 10.
Figure 10.  Installing the Lamp
SOCKET
LAMP