John Deere SB1148 ユーザーズマニュアル

ページ / 52
ASSEMBLY 
OM 0369SB1148-A 
16 
Installation of Electric Deflector Kit 5RDF0020 – For SB1154 & SB1164 Only 
(Figures 10-11-12 & Electrical Diagram) 
1.  Figure  10:    Install  the  longest  clevis 
(item 1)  on  the  actuator  base  (item  2),  the 
shortest one (item 3) on the other end and 
attach using two 1/2" NC x 2 1/2" bolts and 
1/2" NC nylon insert locknuts (items 4-5). 
2.  Figure  10:    Install  a  3/16"  x  1  3/4"  spring 
pin (item 6) on each 1" pin (item 7). 
3.  Figure  10:    Attach  the  actuator  on  the 
chute in the position shown on figure using 
two 1" pins (item 7) and secure with 4mm x 
80mm hairpins (item 8). 
NOTE: The base end of the electric actuator 
attaches in the hole closest to the chute.  
4.  Figure  10  &  diagram:    Connect  the  wires 
to the switch (item 10) as follows: 
• 
72"  black  ground  wire  (item  9)  to  terminal 
"C" (see diagram). 
• 
72"  red  fuse  wire  (item  11)  to  terminal  "B 
(see diagram). 
• 
360"  red  and  black  actuator  wires 
(item 12)  to  terminal  "A"  and  "D"  (see 
diagram). 
5.  Figure 11:  Insert the switch (item 4) in the 
switchbox (item 2), secure with the two nuts 
(items  1-3)  supplied  with  the  switch  and 
screw the rubber cap (item 5) on the switch 
in the order shown. 
6.  Figure 12:  Place the switchbox (item 1) on 
the  lever  in  a  position  that  will  be 
comfortable  when  the  hand  is  on  the  knob 
and attach with the box clamp (item 5), two 
1/4"NC  x  3/4"  hex.  bolts  and  two  1/4" 
lockwashers  (items 3-4)  making  sure  the 
clamp  is  in  the  right  direction  so  the  lower 
openings on the switchbox are not blocked. 
NOTE: Tighten the bolts just enough to securely 
fix the clamp and the switchbox on the lever. DO 
NOT  TIGHTEN  TOO  MUCH    so  the  clamp 
doesn't deform. 
 
 
 
Figure 10